成都制药一厂
The operator must be aware of the power plant devices which are tied into the gas turbine mechanicaly
and electrically and could affect normal operation.General Operating Precautions
•Temperature limits
•Pressure limits
•Vibration limits
•Load limit
•Fire protection system O.P.
•Combustion system O.P.
•Cooldown and Shutdown
4/
有效载荷沈氏家族GE /
High wheelspace temperature may be caused by any of the following faults:
•Restriction in cooling air line
•Wear of turbine seals
•Excessive distortion of the turbine stator
辣妹掌门人下载•Improper positioning of thermocouple
•Malfunctioning combustion system
•Excessive distortion of exhaust inner diffuser
Check wheelspace temperatures very closely on initial strat up
5/
GE /
Temperatures in excess of the maximum are potentially harmful to turbine Hot-Gas-Path parts over a prolonged period of time.High wheelspace temperature reading must be reported to the Nuovo Pignone technical representative as soon as possible.

本文发布于:2024-09-21 01:48:13,感谢您对本站的认可!

本文链接:https://www.17tex.com/xueshu/705206.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:辣妹   民商法   成都   掌门人
留言与评论(共有 0 条评论)
   
验证码:
Copyright ©2019-2024 Comsenz Inc.Powered by © 易纺专利技术学习网 豫ICP备2022007602号 豫公网安备41160202000603 站长QQ:729038198 关于我们 投诉建议