常用钻井工具英文缩写

钻井英语缩写
1.DP  drill pipe  钻杆
2.HWDP  heavy weight (wall) drill pipe  加重钻杆
3.DC  drill collar  钻铤
4.BHA  bottom hole assembly  井下钻具组合
5.STB  stabilizer  钻杆扶正器
6.PNMDC  pony non-magnetic drill collar  短无磁钻铤
7.SMDC  short non-magnetic drill collar  短无磁钻铤
8.PDM  positive displacement motor  螺杆
9.BOP  blowout preventer  封井器呼吸兴奋剂
10. BOPE  blow out preventer equipment  封井器设备
11. IBOP  inside blowout preventer  内防喷工具
12. CSG  casing  套管
13. TBG  tubing  油管
14. JNT/JT  joint  单根
15. XO  cross-over  配合接头
16. IF  internal flush  内平
17. FH  full hole  贯眼
18. REG  regular  正规
19. IU  internal upset  内加厚
20. EU  external upset  外加厚
21. EUE  external upset  外加厚
22. IEU  internal&external upset  内外加厚
23. OH  open hole  裸眼
24. WOB  weight on bit  钻压
25. RPM  revolutions per minute  转速/分钟
26. SPM  strokes per minute  冲程/每分钟
27. ECD  equivalent circulating density  当量泥浆密度
28. MT  metric ton  公制吨
29. DST  drill stem test  钻具测试
30. KS  key seat  键槽
31. KSW  key seat wiper  键槽清洁器
32. STDS  stands  立柱
33. VIS  viscosity  粘度
34. PV  plastic viscosity  塑性粘度
35. YP  yield point  屈服值
36. FL  filtrate loss  滤失
37. WL  water loss  失水
38. TVD  true vertical depth  垂深
39. MD  measured depth  测量井深复合添加剂
40. TD  total depth  总井深
41. PBTD  plug back total depth  人工井底
42. PCS  piece  件,个
43. KOP  kick off point  造斜点
44.ocd DIR  direction  定向
45. AZM  azimuth  方位
46. DEV  deviation  井斜
47. ROP  rate of penetration  机械转速
48. ID  inside-diameter  内径
49. OD  outside diameter  外径
50. FTG  footage  进尺
51. PPG  pounds per gallon  (密度)每加仑磅
52. PSI  pounds per square inch  磅每平方英尺
53. SGL  single  单根
54. LP  low pressure  低压
55. HP  high pressure  高压
56. HP  horsepower  马力
57. HHP  hydraulic horsepower  水马力
58. HTHP  high temperature high pressure  高温高压
59. AD  assistant driller  副司钻
60. LCM  lost circulation material  堵漏剂
61. API  American petroleum institute  美国石油协会
62. IADC  international association of drilling contractors  国际钻井承包商协会
63. CNPC  China national petroleum  中国石油天然气总公司
64. P/N  part number  零件型号
65. S/N  serial number  系列号
66. N/W  net weight  净重
67. G/W  gross weight  毛重
68. P/U  pick up  吊起
69. M/U  make up  接上
70. L/D  lay down  甩开
71. N/U  nipple up  接上
72. N/D  nipple down  卸开
73. R/U  rig up  安装
74. R/D  rig down  拆卸
75. WOC  wait on cement  候凝
76. WOW  wait on water  等水
77. WOW  wait on weather  等天气
78. WOO  wait on order  等指令
79. RIH  run in hole  下钻
80. POOH  pull out of hole  起钻
81. DR  drilling  钻进
82. DDR  daily drilling report  钻井日报表
83. RM  reaming  扩眼(划眼)
84. BR  back ream  倒划眼
85. TOF  top of fish  鱼顶
86. SX  sacks  袋
87. MW  mud weight  泥浆密度
88. CBU  circulate bottom up  循环一周
89. TOH  trip out of hole  起钻
90. MWD  measurement while drilling  随钻测量
91. LWD  logging while drilling  随钻测井
92. POB  personnel on board  井场人员
93. SG  specific gravity  比重
94. NDT  non-destructive test  无损探伤
95. S/I  shut in  关井
96. PTW  permit to work  工作许可
97. BPV  back pressure valve  回压凡尔
98. DIBPV  drop in back pressure valve  投入式单流阀
99. NP  neutral point  中和点
100.UPS  uninterrupted power supply  不间断供电
101.RBP  retrievable bridge plug  可取回桥塞
102.SICP  shut in casing pressure  关井套压
103.SIDPP  shut in drill pipe pressure  关井立压
104.MAASP maximum allowable annular surface pressure 最大允许环空压力
105.BHT bottom hole temperature 井底温度
106.BHP bottom hole pressure 井底压力
107.HP hydrostatic pressure 液柱压力
应付账款管理
108. FP friction pressure 摩擦压力
109. SP surface pressure 地面压力
上海电信大楼
110. CP choke pressure 节流压力
111.CF capacity factor 容积系数
112.DSA drilling spool adaptor 四通转换法兰
113. DSA double studded adaptor 双头载丝法兰
集团经济研究114. CBHP constant bottom hole pressure 恒定井底压力
115. ICP initial circulating pressure 初始循环压力
116. FCP.final circulating pressure 终了循环压力
117. BUR. build up rate 造斜率
118. SS string stabilizer 钻具扶正器
119. EMKL emergency kill line 应急压井管线
120. RMR reamer 扩眼器
121. NBRR near-bit roller reamer 近钻头牙轮扩眼器
122. SR string roller reamer 钻具牙轮扩眼器
123.RCJB reverse circulation junk basket 反循环打捞蓝
124. FPI free point indicator 测卡仪
125. PIC person in charge 负责人
126. PJSM pre-job safety meeting 作业前安全会
127. STK stroke 泵冲
128. ACS automatic crown saver 电子防碰天车
129. PVT pit volume totalizer 泥浆体积计量器
130. IWCF international well control forum 国际井控论坛
131. RH rat hole / right hand 大鼠洞 / 井底口袋
132. LOT leak off test 地破试验
133. PIT pressure integrity test 地破试验
134. FIT formation integrity test 地层完整性试验
135. BTC buttress thread connection 梯形扣
136. LTC long thread connection 长圆扣
137. STC small thread connection 短圆扣
138. CHC circulate hole clean 循环清洗井底
139. ODF original drill floor 原始钻台面高度
140. FAT first aid treatment 急救处理
141. PPF pound per foot 段重
142. TOC top of cement 水泥返高
143. WBM water base mud 水基泥浆

本文发布于:2024-09-22 12:51:13,感谢您对本站的认可!

本文链接:https://www.17tex.com/xueshu/146268.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:压力   泥浆   钻井   循环
留言与评论(共有 0 条评论)
   
验证码:
Copyright ©2019-2024 Comsenz Inc.Powered by © 易纺专利技术学习网 豫ICP备2022007602号 豫公网安备41160202000603 站长QQ:729038198 关于我们 投诉建议