杜邦导电银浆5.1CONNECTION DIAGRAM 5.1.1SVM1-4i and SVM1-20i
NOTE
1Always install the circuit breakers, magnetic contactor, and AC line filter.
2To protect the equipment from lightning surge voltages, install a lightning surge absorber across卧式炭化炉
each pair of power lines and across each power line and the grounding line at the power inlet of the
power magnetics cabinet.
5.1.2SVM1-40i and SVM1-80i
NOTE
1Always install the circuit breakers, magnetic
contactor, and AC line filter.
2To protect the equipment from lightning surge
voltages, install a lightning surge absorber across
each pair of power lines and across each power line
and the grounding line at the power inlet of the
power magnetics cabinet.
5.2CONNECTOR LOCATION 5.2.1SVM1-4i and SVM1-20i
No.Name Remarks
1DC link charge LED
2CZ7-1Main power input connector
3CZ7-2Discharge register connector
无动力
风球马蹄去皮机4CZ7-3Motor power connector5CX29Connector for main power MCC control signal
6CX30ESP signal connection connector
7CXA20Regenerative resistor connector (for alarms)mrp游戏
8CXA19B24VDC power input
9CXA19A24VDC power input
10COP10B Servo FSSB I/F
肥皂生产
设备11COP10A Servo FSSB I/F12ALM Servo alarm status display LED 13JX5Connector for signal check
14LINK FSSB communication status display LED
15JF1Pulsecoder
16POWER Control power status display LED 17CX5X Absolute Pulsecoder battery
18
Tapped hole for grounding the flange