摘要:武汉中央商务区黄海路(二期)工程,设有内支撑的基坑全长约217m,宽约为35~70m,深度约为0.5m~14.2m,维护形式采用钻孔灌注桩+内支撑、双排SMW托玛琳活水杯>漩涡混匀器工法桩+内支撑、放坡形式,内设一道钢筋混凝土内支撑,钢筋混凝土内支撑量截面为1000mm*1000mm、800mm*800mm。局部换撑。在拆除该内支撑结构时,采用了“条桶金刚石绳锯切割钢筋混凝土内支撑”的施工方法,取得了良好的效果。
Abstract: In the Huanghai Road (Phase II) project of Wuhan Central Business District, the foundation pit with internal support is about 217m in length,大理石清洗剂 35 ~ 70m in width and 0.5 ~ 14.2m in depth, the maintenance form uses bored pile + inner support, double row SMW method pile + inner support and grading form. There is a reinforced concrete inner support whose cross-section area is 1000mm*1000mm, 800mm*800mm. The support is changed in local part. In the removal of the inner support structure, it uses t
酒瓶盖
he construction method of "diamond wire saw cutting steel reinforced concrete support", and it has achieved good results.