高压旋喷桩技术地铁隧道穿越软鼓芯~流塑地层中的应用
摘要:南京地铁花神庙站~南京南站站区间隧道穿越软~流塑地质段。针对土层特点,施工过程中采用了地面高压旋喷桩加固、洞内打设超前小导管注浆加固等技术。施工方法具有简单、快捷,不影响洞内正常施工,优化工期、节约成本等优点,加以推广应用。
关键词:地铁隧道高压旋喷桩
热转印墨水配方
abstract: take the temple of nanjing subway station to station tunnel between nanjing south through soft ~ flow model geological section. according to the soil characteristics, construction process using ground high pressure jet grouting pile reinforcement, playing a small hole grouting reinforcement, advance catheter technique. construction method is simple, quick, do not affect a hole to normal construction, optimize the time limit, the cost savings and other advantages, the application.
key words: the subway tunnel high pressure jet grouting pile
芳纶头盔1.工程概况
硬件加密设备
南京地铁花神庙站~南京南站站区间未为iv~vi级围岩,其中包含软~流塑地段单向排水阀884.578延米,该段土层具有高压缩性、高灵敏性、强度低的特点,易产生蠕动现象,开挖后自稳能力极差,易坍塌,地面沉降难以控制。故在地表允许高压旋喷桩施工的地段采用了高压旋喷桩的施工工艺,有效地扩大了地铁施工的工作面,进而大大的提高了施工进度。
线圈骨架

本文发布于:2024-09-22 01:01:44,感谢您对本站的认可!

本文链接:https://www.17tex.com/tex/3/216747.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:施工   地铁   高压   技术   隧道   南京   土层   特点
留言与评论(共有 0 条评论)
   
验证码:
Copyright ©2019-2024 Comsenz Inc.Powered by © 易纺专利技术学习网 豫ICP备2022007602号 豫公网安备41160202000603 站长QQ:729038198 关于我们 投诉建议