福清核电500KV倒送电工程施工管理

福清核电500KV送电工程施工管理
作者:何帆
来源:《城市建设理论研究》玄武岩纤维布2014年第08
        摘要:核电站500KV倒送电系统涉及的子项工程多,工期紧,核电工程质量要求高。本文根据福清核电1号机组500KV倒送电工程的相关实践,对工程进度安排、质量控制、安全管理等方面进行简要的介绍,为福清核电后续机组500KV汽车阻尼板倒送电工程的高质量、高效率的推进,提供有益的参考。
        铭牌生产关键词:手动调速永磁耦合器GISGCB GPA
美团配送箱怎么安装
        中图分类号:TL4 半轴套管文献标识码: A
        Fuqing Nuclear Power 500KV power transmission construction management inverted
        He Fan
        China Nuclear Power Engineering Co., Ltd. Fuqing Fuzhou, construction project department
        Abstract: Nuclear Power 500KV power transmissi system projects involving more than a small project , tight, high quality requirements of nuclear power engineering. Based on the Fuqing nuclear power unit 1 pour 500KV power transmission project related practices on the project schedule, quality control, security management and other aspects of a brief introduction for the Fuqing nuclear power back up units 500KV power transmission engineering, high-quality, high-efficiency promote, provide a useful reference.

本文发布于:2024-09-22 03:35:46,感谢您对本站的认可!

本文链接:https://www.17tex.com/tex/3/166377.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:送电   工程   核电   管理   建设   城市   工程进度   提供
留言与评论(共有 0 条评论)
   
验证码:
Copyright ©2019-2024 Comsenz Inc.Powered by © 易纺专利技术学习网 豫ICP备2022007602号 豫公网安备41160202000603 站长QQ:729038198 关于我们 投诉建议