SV-250 ( SV-260 ) 说明书

SV-250 ( SV-260 )
INSTRUCTION MANUAL
使用說明書Ver – 32
For safe operation
重要安全事項
1.Prior the use of this product, please read the instruction Manual. Keep this Instruction Manual and the user may read it at anytime when necessary.
使用本產品前,請先閱讀本說明書;同時應將此說明書妥善保管以便能隨時查閱.
2.Before turn on the power, be sure to check the power voltage and phase agreeing with the nameplate that indicated in the control box.
電源開啟前,請先確認電源的電壓與相數,是否與控制箱銘牌相符.
3. Grounding the machine is always necessary for safe and normal operation.
為了正常安全運轉,須安裝地線.
4. Check lubricating oil prior to operation.
操作前,請先確認縫紉機潤滑油充足.
5. Check that rotational direction of the motor is correct prior to operation.
操作前,請先確認馬達轉動方向正確.
6. So as to prevent personal injuries during operation, be careful not to allow your head and hands to come close to the moving parts. Also never try to stop it with external forces.
罗口袜使用中,切勿將,手靠近皮帶輪,皮帶,旋梭,天平等移動部份;同時也不可以用外力,強制停止移動部份.
7. For the following conditions, turn off the power or disconnect the power plug from receptacle.
發生下列情況時,應立即關閉電源開關或者拔下電源插:
7.1 For threading needle or replacing bobbin.
穿線和更換旋梭時.
7.2 To plug or unplug any connectors from control box.
插拔控制箱上任何連接線與接.
7.3 For maintenance and repairing.
电暖手套保養與修理時.
7.4 When machine is not at use, inspected or adjusted.
电炉配料翻抬針車,取下皮帶時. 機器休息不用時.
7.5 When lightning and thunder occurs.
辐照灭菌设备
打雷閃電時.
8. Repairing, remodeling and adjusting works must only be done by appropriately trained technicians
or specially skilled personnel.
本產品的修理,改造,調整;應由受過專門訓練的技術人員來進行.
I.Set up
安裝
1. How to connect the cord
連接線的接法:
1).Open the front cover of the control box, the following connectors of the P.C.B are shown in Fig.3. According to the sewing machine model, connect the connecting lines to the appropriate position.
.
1) CN6:Synchronizer connector.
CN6 :同步器接.
2) CN7:Encoder connector.
CN7:馬達編碼器接.
3) CN13: Safety switch connector.
CN13:安全開關接.
4) CN1: Pattern setting switch box connector.
CN1: 選針盒接.
8) CN2: Front cover counter (CO2) connector.  CN2:前蓋C02接.
9) CN4: Material edge sensor connector.
CN4:布端檢出器插.
10) CN8: Standing pedal operation connector.  CN8:立式作業踏板接.
Option IN_A : pin 7 & 8
.
.
.
.
1) Power source line connector.
電源線接.
2) Motor power line connector.
馬達動力線接.
II Operating way
操作方法:
1. For regular operations:(Turning the power switch on without pressing any button)siv-011
一般操作:(不按任何鍵下開機)
The external VR let the user adjust freely the speed of the motor.
外部VR可供使用者自由調整控制馬達的操作速度.
速度基座調整
After replacement of speed unit, Adjust speed unit standard voltage following the below procedures.
更換速度基座之後,速度基座的中立位準必須依下列步驟重新調整.
Place the pedal sensor inner lever arm to the neutral position .
Loosen the hexagon screw (A) from the speed unit. Adjust the induction arm (B) so that LD1 from the main board turns on.
速度基座拉臂置於中立點.將速度基座上螺絲(A)轉鬆;調整搖臂位置(B)使主機板上LD1點亮.
Tighten the hexagon screw (A).
將螺絲(A)轉緊.
LD1保持點亮,
消音材料
請依下表進行確認:
錯誤顯示錯誤內容確認項目Er-0 過電流電流太大
馬達線圈阻抗太小
Er-1 同步器信號異常同步器接鬆脫,斷線;
皮帶沒有傳動針車.

本文发布于:2024-09-20 14:44:16,感谢您对本站的认可!

本文链接:https://www.17tex.com/tex/2/322855.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:皮帶   電源   接頭   調整   確認   速度   基座
留言与评论(共有 0 条评论)
   
验证码:
Copyright ©2019-2024 Comsenz Inc.Powered by © 易纺专利技术学习网 豫ICP备2022007602号 豫公网安备41160202000603 站长QQ:729038198 关于我们 投诉建议