《计算机专业英语》第06章在线测试

计算机专业英语》第06章在线测试
 《计算机专业英语》第06章在线测试
剩余时间:
59:56
窗体顶端
 答题须知:1、本卷满分20分。
          2、答完题后,请一定要单击下面的“交卷”按钮交卷,否则无法记录本试卷的成绩
          3、在交卷之前,不要刷新本网页,否则你的答题结果将会被清空。
第一题、单项选择题(每题1分,5道题共5分)
 1Data ________ can reduce the amount of data sent or stored by partially eliminating inherent redundancy.
Acompression
Bconversion
Cconfiguration
Dcompilation锚杆挡墙
 2In the system development process, the system analyst defines the user, needs, requirements and methods in the ________ phase.
Adesign
Banalysis
Ctesting
Dimplementation
 3In the system development process, modularity is a very well-established principle used in the ________ phase.
Adesign
Banalysis
Cimplementation
Dtesting
 4The most commonly used tool in the design phase is the ________.
Aflowcharts
Bobject-relationship chart
Ctopology chart
Dstructure chart
机房环控
 5In the system development process, ________ and pseudocode are tools used by programmers in the implementation phase.
Atoplogic chart
Bobject-relationship chart
Cflowcharts
Dstructure chart
第二题、多项选择题(每题2分,5道题共10分)
 1The development process in the software life cycle involves four phases: analysis, design, implementation, and ________.
苯并芘结构式
A连续流砂过滤器、analysis
Bdesign
Cimplementation
Daudit
Etesting
 2Software engineering is related to the disciplines of _____________________.
Acomputer science
Bnetural network
Cproject management
Dsystems engineering
Enatural language
 3which aspect have to be considered in the design of a piece of software.
ACompatibility
BExtensibility
CFault-tolerance
DMaintainability
EMarketability
FModularity
GPackaging
 4Computer programming is the process of _______________ the source code of computer programs.
Awriting
Btesting
Cdebugging
Dmaintaining
 5There are a number of processes, activities and practices that are unique to maintainers, for example:
ATransition: a controlled and coordinated sequence of activities during which a system is transferred progressively from the developer to the maintainer
BService Level Agreements (SLAs) and specialized (domain-specific) maintenance contracts negotiated by maintainers
CModification Request and Problem Report Help Desk: a problem-handling process used by maintainers to prioritize, documents and route the requests they receive
DModification Request acceptance/rejection: modification request work over a certain size/effort/complexity may be rejected by maintainers and rerouted to a developer
第三题、判断题(每题1分,5氧浓度传感器道题共5分)
 1The revolution of the software industry is producing good, solid, bulletproof programs at low cost and on time.
正确
错误
 2Software engineers develop software tools and collections of tools called programming environments to improve the development process.
正确
错误
20kv高压直流电源
 3Requirements analysis is not critical to the success of a development project
正确
错误
 4The aspect of that,New capabilities can be added to the software without major changes to the underlying architecture is called Extensibility .
正确
错误
 5Within software engineering, programming is regarded as one phase in a software development process.
正确
错误
 
窗体底端
恭喜,交卷操作成功完成!你本次进行的《计算机专业英语》第06章在线测试的得分为 20(满分20分),本次成绩已入库。若对成绩不满意,可重新再测,取最高分。
测试结果如下:
1.1 [单选] [] Data ________ can reduce the amount of data sent or stored by partially eliminating inherent redundancy.
1.2 [单选] [] In the system development process, the system analyst defines the user, needs, requirements and methods in the ________ phase.
1.3 [单选] [] In the system development process, modularity is a very well-established principle used in the ________ phase.
1.4 [单选] [] The most commonly used tool in the design phase is the ________.
1.5 [单选] [] In the system development process, ________ and pseudocode are tools used by programmers in the implementation phase.
2.1 [多选] [] The development process in the software life cycle involves four phases: analysis, design, implementation, and ________.
2.2 [多选] [] Software engineering is related to the disciplines of _____________________.
2.3 [多选] [] which aspect have to be considered in the design of a piece of software.
2.4 [多选] [] Computer programming is the process of _______________ the source code of computer programs.
2.5 [多选] [] There are a number of processes, activities and practices that are unique to maintainers, for example:
3.1 [判断] [] The revolution of the software industry is producing good, solid, bulletproof programs at low cost and on time.
3.2 [判断] [] Software engineers develop software tools and collections of tools called programming environments to improve the development process.
3.3 [判断] [] Requirements analysis is not critical to the success of a development project
3.4 [判断] [] The aspect of that,New capabilities can be added to the software without major changes to the underlying architecture is called Extensibility .
3.5 [判断] [] Within software engineering, programming is regarded as one phase in a software development process.

本文发布于:2024-09-25 18:25:20,感谢您对本站的认可!

本文链接:https://www.17tex.com/tex/2/235572.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:交卷   结果   成绩   每题   无法
留言与评论(共有 0 条评论)
   
验证码:
Copyright ©2019-2024 Comsenz Inc.Powered by © 易纺专利技术学习网 豫ICP备2022007602号 豫公网安备41160202000603 站长QQ:729038198 关于我们 投诉建议