大跨度连续刚构桥中跨合龙段顶推施工技术

大跨度连续刚构桥中跨合龙段顶推施工技术
作者:胡琪
防身报警器来源:《价值工程》2017一体式三格化粪池年第18
        摘要:向莆铁路莆田特大桥跨沈海高速公路连续刚构桥具有跨度大、小半径、施工干扰多、安全隐患大、技术复杂等特点,通过对对中跨合龙段顶推施工技术总结回顾,希望可为今后同类特大桥施工提供借鉴和建议。通过计算、对比、分析,得出四点同时、同步顶推,墩顶偏移控制为主,顶推力控制为辅的双控原则进行指导施工,能够更有利于改善主梁和桥墩的变形,并可以有效改善桥墩底部、顶部墩梁固结处的受力。
        Abstract The continuous rigid frame bridge of the Shenyang-Haikou expressway of Putian Bridge in Xiangpu Railway has the characteristics of large span生命晶石,蛇油精 small radius怎么自制纳米胶带防辐射口罩 much construction interference large safety hazard and complicated technology. Through the summary of the incremental launching construction technology of mid-span closure section the author hopes to provide reference and recommendations for the future construction of similar bridge. Through the calculation comparison and analysis the du
al control principle of pier top offset control at first and supplemented by the top thrust control is got to guide construction and this control principle can be more conducive to improving the deformation of the main beam and pier and can effectively improve the force in bottom of the pier and the top of the pile beam consolidation.

本文发布于:2024-09-22 04:23:22,感谢您对本站的认可!

本文链接:https://www.17tex.com/tex/2/117616.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:施工   大桥   控制   技术   来源   刚构桥   能够   桥墩
留言与评论(共有 0 条评论)
   
验证码:
Copyright ©2019-2024 Comsenz Inc.Powered by © 易纺专利技术学习网 豫ICP备2022007602号 豫公网安备41160202000603 站长QQ:729038198 关于我们 投诉建议