装配式建筑设备与电气工程施工质量及验收规程DB11∕T 1709-2019

目次
1 总则 (01)
2 术语 (02)
3 基本规定 (03)
4 建筑给水排水及供暖工程 (05)
4.1 一般规定 (05)
4.2 预制构件的预留预埋 (07)
4.3 管道及配件安装 (08)
4.4 集成厨房安装 (11)
4.5 集成卫生间安装 (12)
4.6 户内中水系统安装 (14)
4.7 地板辐射供暖系统安装 (15)
薄鳅
4.8 管道支吊架安装 (16)
4.9 系统调试 (19)
5 建筑通风与空调工程 (21)
5.1 一般规定 (21)
5.2 预制构件的预留预埋 (22)
5.3 风管及配件安装 (23)
5.4 新风系统设备安装 (25)
5.5 多联分体式空调系统安装 (26)
5.6 管道支吊架安装 (28)
5.7 防腐与绝热 (29)
5.8 管道与设备标识 (30)
5.9 系统调试 (32)
6 建筑电气工程 (34)
6.1 一般规定 (34)
6.2 预制构件的预留预埋 (35)
6.3 导管、槽盒敷设 (35)
6.4 导管、槽盒内配线 (37)
6.5 配电箱安装 (39)
6.6 照明器具安装 (40)
6.7 火灾自动报警系统安装 (42)
6.8 防雷与接地 (43)
6.9 抗震支吊架安装 (45)车联网天线
塑钢拉链6.10 系统试运行 (46)
附录A  装配式建筑设备与电气工程子分部工程和分项工程划分表 (48)
附录B  装配式建筑设备与电气工程施工过程验收记录 (50)
本规程用词说明 (53)
引用标准名录 (54)
附:条文说明 (55)
Contents
1 General provisions (01)
2 Terms (02)
3 Basic requirements (03)
4 Building water supply drainage and heating engineering (05)
4.1 General requirements (05)
4.2 Prefabricated componentwith reserved holes and embedded parts (07)
4.3 Pipe and fitting installation (08)
4.4 Integrated kitchen installation (11)
4.5 Integrated bathroom installation (12)
4.6 Indoor water system installation (14)
4.7 Hot water floor radiant heating system installation (15)
4.8 Pipe support and hanger installation (16)
4.9 System debugging (19)木盒制作
5Building ventilation and air conditioningengineering (21)
5.1 General requirements (21)
5.2 Prefabricated componentwith reserved holes and embedded parts (22)
5.3 Duct and fitting installation (23)
5.4 Fresh air system equipment installation (25)
5.5 Multi-connected split air conditioning system installation (26)
5.6 Pipe support and hanger installation (28)
5.7 Anticorrosion and thermalinsulation (29)
5.8 Pipe and equipment label (30)
5.9 System debugging (32)
6Building electricalengineering (34)
6.1 General requirements (34)
空心砌块
6.2 Prefabricated componentwith reserved holes and embedded parts (35)
6.3 Trunking and conduit laying (35)
6.4 Conduit and trunking wiring (37)
6.5 Distribution box installation (39)
6.6 Lighting waresinstallation (40)
6.7 Automatic fire alarm system installation (42)
6.8 Lightning and grounding (43)
6.9 Seismic bracing installation (45)
6.10 System test run (46)
Appendix    A Prefabricated building equipment and electrical engineering sub-division and Sub-item project division table (48)
Appendix    B Prefabricated building equipment and electrical engineering construction process acceptance record (50)
Explanation of wording in the specification (53)
List of quoted standards (54)
Addition:Explanation of provisions (55)
1 总则
负压引流球1.0.1为推进北京市装配式混凝土建筑,规范装配式建筑设备与电气工程施工质量验收标准,结合本市的实际情况,制订本规程。
1.0.2 本规程适用于北京市行政区域内装配式混凝土结构住宅工程内设备与电气工程的施工质量及验收。
1.0.3 装配式建筑设备与电气工程施工过程应遵循安全可靠、经济合理、技术先进、整体美观、维护方便的原则,并应符合节能、节地、节水、节材和环境保护的要求。
1.0.4 装配式建筑设备与电气工程施工质量及验收除应符合本规程外,尚应符合现行国家、行业和北京市现行有关标准的规定。

本文发布于:2024-09-21 08:15:32,感谢您对本站的认可!

本文链接:https://www.17tex.com/tex/1/184204.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

留言与评论(共有 0 条评论)
   
验证码:
Copyright ©2019-2024 Comsenz Inc.Powered by © 易纺专利技术学习网 豫ICP备2022007602号 豫公网安备41160202000603 站长QQ:729038198 关于我们 投诉建议