Project:
Location:
Owner:
检验试验计划
Inspection Test Plan
Date:
Rev.
Contractor:
2022.02 .08
02
Inspection Test Plan
编制:
Prepared:
审核:
Review:
批准:
Approval:
××××××建设有限公司
2022/02/08
总包LOGO
Conrtactor Name:
Inspection & Test Plan
ITP)
建设单位:
380吨/年植物功能性材料项目
ITP Section No.: 0.0 施工前Pre-construction(),1.0土建Civil(),2.0 钢结构Structurl Steel(),3.0设备 Equipment(),4.0 管道Piping(),5.0 电气Electrical(), 6.0 仪器仪表Instrument(),7.0 系统移交SystemTurnover()8. 工程竣工验收Final Acceptance Of The Project()
ITP No.
INSPECTION ACTIVITY
APPLICABLE
PROCEDURE
ACCEPTANCE
CRITERIA
GRADE
RESPONSIBILITY
(Note)
(Note)
Contr Ashlan
QSC SQIB
actor d
INSPECTION
FREQUENCY
QUALITY RECORD
/VERIFICATION
DOCUMENT
0.0 Pre-construction0.001
0.002
0.003
0.004
Contractspecification
合同要求
Contractspecification
合同要求
Contractspecification
合同要求
Contractspecification
合同要求
Contractspecification
合同要求
Contractspecification
合同要求
Contractspecification
合同要求
Contract specification
合同要求
Contract specification
合同要求
Chinese Business Law
政府相关法规
Contractspecification
合同要求
Contractspecification
合同要求
Contractspecification
合同要求
Contractspecification
合同要求
Contractspecification
合同要求
Contractspecification
合同要求
Contract specification/QC
Plan合同要求/质量方案
Quality Calibration
质量校验
A
A
A
A
QR
I/R
I/R
I/R
R
R
R
R
R
R
R
R
R
R
R
R
Before Construction
施工开始前
Before Construction
施工开始前
Before Construction
施工开始前
Before Construction
施工开始前
Before Construction
施工开始前
Before Construction
施工开始前
Before Construction
施工开始前
Before commencement
开工前
Before commencement
开工前
Review Record
报审记录
Review Record
报审记录
Review Record
报审记录
Joint Review Record
会审纪录
Joint Review Record
会审纪录
Review Record
报审记录
Review Record
报审记录
Review Record
报审记录
Review Record
报审记录
Certification of contractor
施工单位资质和证书
Construction execution plan review
施工组织设计审查
QA/QC Plan review
合同质量计划审查
Design explanation
设计交底
Joint review of construction drawings
施工图会审
0.005
A
I/R
R
R
R
Audit of construction proposal
0.006
专项方案审查
0.007
Technical Clarification
方案技术交底
Personnel certification and experience
人员资质审查
Measuring Instrument Inspection
周期检定计量器具报验
A
I/R
R R R
B
I/R
R R R
0.008
A QR
R
R
R
0.009
A
QR
R
R
R
ITP No.
INSPECTION ACTIVITY
APPLICABLE
PROCEDURE
Contract specification
合同要求
Contractspecification
合同要求
Contract specification
合同要求
Contract specification
合同要求
ACCEPTANCE
CRITERIA
HSE Release Inspection
HSE放行
Chinese Business Law
政府相关法规
Chinese Business Law
政府相关法规
Contract specification/QC
GRADE
RESPONSIBILITY
(Note)
(Note)
Contr Ashlan
QSC SQIB
actor d
INSPECTION
FREQUENCY
Before commencement
开工前
Before commencement
开工前
Before Construction
施工开始前
Before Construction
施工开始前
QUALITY RECORD
/VERIFICATION
DOCUMENT
Review Record
报审报告
Review Record
报审报告
Review Record
报审记录
Copy of Notification
0.010
0.011
Equipment Inspection
施工设备进场报验
Commencement report
开工报告
Quality supervision /Safety supervision
质检安检报审
A
A
QR
I/R
R
R
R
R
R
R
0.012
A
I/R
R
R
R
Notification of Pressure Vessel and Pipe
0.013
before Construction
A
QR
R
R
R
压力管道施工前告知(如有)
1.0 Civil
1.001
Survey Of Position
工程定位测量
Plan
合同要求/质量方案
GB50026-2007 GB50026-2007 Sec.8. H I R
I/R
每个单体
Each Batch
每批
TJ2.2. 1
Review Record
报审报告
Copy of Certificate
Testing Report
Testing Report
TJ2.5.7
Page 2 of 12
TJ2.5. 1~TJ2.5.5
Testing Report
Material Site Acceptance
1.002
材料进场
Welder Certification Qualification
1.003
焊工进场报验
Concrete Mix Design
1.004
混凝土配合比
Welding Test of Redar Joint
钢筋焊接测试
GB50204-2015
JGJ 18-2012
GB50204-2015
GB50204-2015 Sec.3.
JGJ18-2012 Sec. 1./6.
GB50204-2015 Sec.7.3
A
A
A
T/QR
T/QR
I
I/R
R
R
W/R
R
R
Each Welder
每个焊工
Grade of concrete
混凝土等级
1 set(3Joints)for
300
Welding Joint
1.005
JGJ18-2012
JGJ18-2012 Sec.5.
A
P/QR
R
W/R
每300个接头测一组
Compression test
1.006
抗压强度试验
Field Density Test Of Backfilling
1.007
回填土含水率/干密度检查
GB50204-2015
GB/T50081-2002
GB/T50082-2009
GB50204-2015
GB/T50081-2002
GB/T50082-2009
GB50202-2018
Sec.6.3.3,6.3.4
B
P/QR
R
W/R
The whole project
整个工程
GB50202-2018 B
P/QR
R
W/R
1 Test Per 500M2
每500M2测1组
Testing Report
ITP No.
INSPECTION ACTIVITY
APPLICABLE
PROCEDURE
ACCEPTANCE
CRITERIA
GRADE
RESPONSIBILITY
(Note)
(Note)
Contr AshlaQSC SQI
actor n d B
INSPECTION
FREQUENCY
QUALITY RECORD
/VERIFICATION
DOCUMENT
1.1 Earth and foundation1. 101
Earth excavation
土方开挖
GB50202-2018 GB50202-2018 Sec.6. A I R
I/R
Each monomer
每个单体
TJ4.5.1.1
Inspection of foundation pit
1. 102
地基验槽
Foundation soil replacement
1. 103
地基土换填
模板安装
1. 104
installation
Inspection Of Formwork Before
1. 105
Concrete Pouring
模板验收
Inspection Of Rebar Before Concrete
1. 106
Pouring
钢筋验收
1. 107
钢筋安装
installation
1. 108
Concrete Construction
混凝土施工
Inspection For Dismantle Of Formwork
1. 109
拆模验收
Inspection Of Concrete
1. 110
现浇结构验收
Secondary grouting
1. 111
二次灌浆
GB50202-2018
GB50202-2018
GB50202-2018 Sec.6.
Contract specification
合同要求
Contract specification
合同要求
A I
I/R
I/R
Each monomer
每个单体
TJ2.6. 14
A I
I/R
I/R
Each area
每个区域
Contract specification
合同要求
A I W W
First installation
第一次安装
Extra 136
GB50204-2015
GB50204-2015 Sec.4.
A
I
R
I/R
Each Foundation
每个基础
TJ4.4.1.1
TJ4.4.2.1/TJ4.4.2.2/TJ
GB50204-2015
Contract specification
合同要求
GB50204-2015
GB50204-2015
GB50204-2015
GB50204-2015 Sec.5.
Contract specification
合同要求
GB50204-2015 Sec.7.
GB50204-2015 Sec.4.
GB50204-2015 Sec.8.
A
I
R
I/R
Each Foundation
每个基础
4.4.2.7/TJ4.4.2.8
TJ2.6. 1
Extra 136
A
A
C
B
B
I
I
I
I
I
W
R
R
R
R
W
I/R
I
I/R
I/R
First installation
第一次安装
Each Time
每次
Each Part
每个部位
Each Foundation
每个基础
Each Foundation
每个基础
TJ4.4.3.2~TJ4.4.3.3
TJ4.4.3.2~TJ4.4.3.3
TJ4.4.3.2~TJ4.4.3.3
GB/T 50448-2015 GB/T 50448-2015 Sec.5.
ITP No.
INSPECTION ACTIVITY
Acceptance of water tank waterproof and
1. 112
anti-corrosion水池防水防腐验收
Water Basin Impoundment Test
1. 113
水池满水试水
Filling Soil Laboratory Test
1. 114
回填压实度检测
Inspection before Backfilling
1. 115
回填验收
Acceptance of foundation work
1. 116
基础工程验收
APPLICABLE
PROCEDURE
GB/T 50934-2013
GB50202-2018
GB50202-2018
GB50202-2018
GB50300-2013
GBJ97-87
GB50202-2002
GBJ97-87
GB50202-2002
GBJ97-87
GB50204-2002
GBJ97-87
GB50204-2002
ACCEPTANCE
CRITERIA
GRADE
RESPONSIBILITY
(Note)
(Note)
Contr Ashlan
QSC SQIB
actor d
A
B
A
A
I
P/QR
I
I
I
R
R
I/R
I/R
W/R
I/R
I/R
INSPECTION
FREQUENCY
Each Pit
每个水池
Each Layer
每层
每个单体
QUALITY RECORD
/VERIFICATION
DOCUMENT
Full water test record
Testing Report
TJ4.5.4.1
TJ4
R
GB/T 50934-2013 5.4.7条
GB50202-2018 Sec.6.3
GB50202-2018 Sec.6.3
GB50202-2018 Sec.8.
GB50300-2013
Each work
每个工程
1.2 ROAD AND PAVING WORK
Bedding inspection
1.201
基底标高检查/验槽
GBJ97-87 Sec.3
GB50202-2002
Sec.6.2.2&6.2.4
GBJ97-87 Sec.3
GB50202-2002 Sec.6.3.3 &
6.3.4
GBJ97-87 Sec.4.5&4.6
GB50204-2002 Sec.5
GBJ97-87 Sec.4.4.1&4.4.2
GB50204-2002 Sec.4
A
I/QR
I/T
I/QR
H/R
W/R
H/R
H
W/R
H
Each Section
每段
1 Test Per 1000M2
每1000M2测1组
Each Section
TJ2.6.3
1.202
Desity Test of Sub-Grade
基底压实度测试
B
Testing Report
TJ4.1.25
Inspection of Rebar,Embedded Item
1.203
Before Concrete Pouring(Concealed
Work)
混凝土浇筑前钢筋及预埋件检查
Inspection of Formwork Before
Concrete Pouring
1.204
模板安装检查
1.205
1.206
Concrete Pouring
混凝土浇筑
Compressive Stength Test
混凝土强度检测
B
B
B
B
I/QR
I/QR
W/R
W/R
W
Each Section
TJ4.1.22
GBJ97-87
GBJ97-87
GB50204-2002
GB/T50107-2010
GBJ97-87 Sec.4.4.3~4.4.6
GBJ97-87 Sec.5.1.5&5.2.3
GB50204-2002
Sec.7.4.1&7.4.2
GB/T50107-2010 Sec.3&4
W
Each Section
2 Set per 200m3 or one
day每天或200m3,2组(1
set for standerd Curing
&1 set for natural curing)
TJ4.1.27
Testing Report
I/T W/R W
ITP No.
INSPECTION ACTIVITY
Inspection of expansion joint between
1.207
concrete pavement
混凝土路面道路伸缩缝检验
Survery of Conceret Surface Level
and Slope
混凝土标高和坡度测试
Final Visual Inspecting (Punch list)
1.209
总体验收(尾项清单)
APPLICABLE
PROCEDURE
GBJ97-87
ACCEPTANCE
CRITERIA
GBJ97-87 Sec.4.6&5.2.3
GRADE
RESPONSIBILITY
QUALITY RECORD
INSPECTION
(Note)
(Note)
/VERIFICATION
FREQUENCY
Contr Ashlan
DOCUMENT
QSC SQIB
actor d
1 set per 100m,2 set per
B I W W
20set
每100m1组(纵缝),每20条缝2组(横缝)
B I/QR WR W/R
1.208
GBJ97-87 GBJ97-87 Sec.5.2.3
Each Section
GBJ97-87 GBJ97-87 Sec.5.2
A I/QR W/R W/R
Each Road
Punch list
2.0 STRUCTURAL STEEL
Check Welding Procedure
GB50205-2001 sec.5
2.001
Specifications(WPS)
焊接施工工艺审核
Witness Welding Procedure
2.002
Qualification Test(PQR)As Required
GB50205-2001 Sec.5.
焊接工艺评定审核
GB50205-2001 Sec.5.
A
QR
R
R
By WPS
焊接工艺指导
Each WPQR
焊接工艺规范
Each Welder
每个焊工
Copy of WPS
GB50205-2001 Sec.5.
A
QR
T/QR
R
R
Copy of PQR
Copy of Certificate
SH/T 3503 -J131
SH/T 3543-G114
Copy of Material mill
certificate
2.003
Welding Certification/Qualification
焊工证书
Material Site Acceptance
材料进场
Check the Steel Structure Installation
钢结构安装检查
Field Weiding Visual Examination
现场焊接检查
De-rust inspection
除锈检查
Inspection of Painting
油漆检查
Final Visual Inspection
钢结构工程验收
GB50205-2001 GB50205-2001 Sec.5.2.3 A R R
2.004
GB50205-2001
GB50205-2001 Sec.4.
A
I/QR
I/R
I/R
Each Batch
每批
2.005
2.006
2.007
2.008
2.009
GB50205-2001
GB50205-2001
GB50205-2001
GB50205-2001
GB50205-2001
GB50300-2013
GB50205-2001 Sec. 10.
GB50205-2001 Sec.5.
GB50205-2001 Sec. 14.
GB50205-2001 Sec. 14.
GB50205-2002 Sec. 15.
GB50300-2013
B
B
H
H
A
I
I
I
I
I
R
R
R
R
I/R
I/R
I/R
I/R
I/R
I/R
R
Each Position
每个位置
Each Position
每个位置
Site Welding
现场焊缝
Each Position
每个位置
Each work
每个工程
GJ4.7. 1/GJ4.7.2
GJ4.2.1
GJ4. 11. 1/GJ2.4
GJ4. 11. 1
GJ4
ITP No.
INSPECTION ACTIVITY
APPLICABLE
PROCEDURE
ACCEPTANCE
CRITERIA
GRADE
RESPONSIBILITY
(Note)
(Note)
Contr Ashlan
QSC SQIB
actor d
INSPECTION
FREQUENCY
QUALITY RECORD
/VERIFICATION
DOCUMENT
3.0 Equipment3.001
SH/T3541-2007
SH/T3541-2007 Sec.4
H
I/QR
I/R
I/R
W/R
Open Box Inspection
开箱检验
Foundation Handover
基础检查交接
Equipment Installation Inspection
设备安装检查
Each Equipment
每 一设备
Each Equipment
每 一设备
SH/T 3503-J117
SH/T 3503-J204
3.002
SH/T3541-2007
SH/T3541-2007 Sec.4
A
I
W
SH/T3541-2007
SH/T3541-2007 Sec.5
A I W
W/R
SH/T3541-2007 Sec.5
A
3.003
Each Equipment
每 一设备
SH/T 3503-J301
Anchor Bolt Inspection
3.004
地脚螺栓检查
Running Test
3.005
试车
3.006
Final Visual Inspection
设备安装工程验收
SH/T3541-2007
SH/T3541-2007
SH/T3508-2011
I
W
W
Each Equipment
每 一设备
Each Equipment
每 一设备
R
Each work
每个工程
SH/T 3503-J113
SH/T3541-2007 Sec.7.
SH/T3508-2011Sec.6.
A
A
T
I
W
I/R
W/R
I/R
SH/T 3503-J318
SH/T 3508-Y04
4.0 Piping4.1 Water and Sewerage Piping
Material Site Acceptance
4. 101
材料进场
4. 102
SH/T3533-2013
SH/T3533-2013
SH/T3533-2013
SH/T3533-2013
SH/T3533-2013 Sec.4.
SH/T3533-2013 Sec.5.
SH/T3533-2013 Sec.5.
SH/T3533-2013 Sec.5.
A
H
A
A
I/QR
I
I
I
I/R
R
R
R
I/R
I/R
I/R
I/R
R
Each time
每次
Each time
每次
Each time
每次
Each time
每次
SH/T 3503 -J132
Copy of Material mill
certificate
Pipe groove setting out
管沟测量放线
Excavation
4. 103
土方开挖
Groove Acceptance
4. 104
管沟验槽
Weld Procedures ( WPS & PQR )
4. 105
焊接程序 ( 焊接工艺评定与焊接工艺 指导书 )
SH/T 3503-J203
TJ4.1.1.1
SH/T 3503-J201
Copy of WPS and
PQR
NB/T47014-2011
NB/T47014-2011
A
T/QR
R
As Per ASME IX
Welder Certification / Welder
4. 106
Qualification Test
焊工证书与考试
GB50236-2011
GB50236-2011 Sec.6
A
T/QR
W/R
R
Each Welder
每个焊工
SH/T 3503-J113
Copy of Certificates
ITP No.
INSPECTION ACTIVITY
Fit-Up and Welding Inspection
4. 107
(Master piece) 组对和焊接(样板)
Fitting up Inspection
4. 108
组对检查
4. 109
4. 110
Welding Visual Inspection
焊接外观检查
Weld Records
焊接记录
APPLICABLE
PROCEDURE
GB-50235-2010
GB50236-2011
GB50236-2011
SH/T3533-2013
GB50236-2011
SH/T3533-2013
ACCEPTANCE
CRITERIA
GB-50235-2010
GB50236- 2011
GB50236-2011sec. 13.
SH/T3533-2013 sec.6.
GB50236-2011sec. 13.
SH/T3533-2013 sec.6.
GRADE
RESPONSIBILITY
(Note)
(Note)
Contr Ashlan
QSC SQIB
actor d
INSPECTION
FREQUENCY
First welding
第一次焊接
Each Joint
每个口
Each Joint
每个口
Each Weld Joint
每道口
As Required
按需要
Follow NDE
Requirements
按Pro
Ra求
按比例
QUALITY RECORD
/VERIFICATION
DOCUMENT
Extra 136
As construction
contractor
As construction
contractor
A
B
B
B
I
I
I
I
W
R
R
R
W
W
W
I/R
GB50236-2011
SH/T3533-2013
GB50236-2011sec. 13.
SH/T3533-2013 sec.6.
SH/T 3503-G415
Test Report
Test Report
SH/T 3503-J402
SH/T 3543-G406
According to test
package
SHT3503-J406
SHT3503-J410
SH/T 3503-J408
SH/T 3503-J112
TJ4.1.2.1
TJ4. 1.27
RT/UT/MT/PT examination for
4. 111
weldJoints 焊逢NDE检查
4. 112
4. 113
4. 114
NDE检查出现不合格的焊缝定位及返 修
Valve Test
阀门试验
Pipe Installation
NB/T47013-2015
NB/T47013.2-2015
SH/T3533-2013
SH/T3533-2013
SH/T3533-2013
SH/T3533-2013
SH/T3533-2013
SH/T3533-2013
SH/T3533-2013
NB/T47013-2015
NB/T47013.2-2015
SH/T3533-2013 Sec.4.
SH/T3533-2013 Sec.6.
SH/T3533-2013 Sec.8.
SH/T3533-2013 Sec.8.
SH/T3533-2013 Sec.6.
SH/T3533-2013 Sec.5.
SH/T3533-2013 Sec.7.
A
A
A
B
A
A
A
A
A
P/QR
I
T/QR
I
I
I
I
I
I
R
R
R
R
W
W
W
R
R
R
W
W/R
I
W/R
W/R
W/R
I/R
I/R
管线安装
Pressure Test/Water Obturation Test
4. 115
压力试验/闭水试验
Pipeline Flushing
4. 116
管道冲洗
Concealment Acceptance
4. 117
隐蔽验收
Back Fill
4. 118
土方回填
4. 119
井室验收
4.2
Each Line
每条管线
Each Line
每条管线
Each Pipeline
每条线
Each Pipeline
每条线
Each Pipeline
每条线
Each work
每个井室
Material Site Acceptance
4.201
材料进场
Weld Procedures ( WPS & PQR )
4.202
焊接程序 (焊接工艺评定与焊接工艺指导书)
SH3501-2011
SH3501-2011 Sec.5.
A
I/QR
I/R
I/R
A
T/QR
R
Each time
每次
SH/T 3503 -J132
Copy of Material mill
certificate
GB50236-2011
NB/T47014-2011
GB50683-2011
NB/T47014-2011
R
As Per ASME IX
Copy of WPS and
PQR
ITP No.
INSPECTION ACTIVITY
APPLICABLE
PROCEDURE
ACCEPTANCE
CRITERIA
GRADE
RESPONSIBILITY
(Note)
(Note)
Contr Ashlan
QSC SQIB
actor d
INSPECTION
FREQUENCY
Each Welder
每个焊工
QUALITY RECORD
/VERIFICATION
DOCUMENT
SH/T 3503-J113
Welder Certification / Welder
4.203
Qualification Test
焊工证书与考试
Fit-Up and Welding Inspection
4.204
(Master piece) 组对和焊接(样板)
Fitting up Inspection
4.205
组对检查
Welding Visual Inspection
4.206
焊接外观检查
Weld Records
4.207
焊接记录
GB50236-2011
GB50236-2011 Sec.6
A
T/QR
W/R
R
GB-50235-2010
GB50236-2011
GB50236-2011
SH3501-2011
GB50236-2011
SH3501-2011
GB50236-2011
SH3501-2011
NB/T47013-2015
NB/T47013.2-2015
SH3501-2011
SH3501-2011
SH3501-2011
SH3501-2011
SH3501-2011
GB-50235-2010
GB50236- 2011
GB50236-2011 Sec. 13.
SH3501-2011 Sec.6.
GB50236-2011 Sec. 13.
SH3501-2011 Sec.7.
GB50236-2011 Sec. 13.
SH3501-2011 Sec.7.
A
B
B
B
I
I
I
I
W
R
R
R
W
W
W
I/R
R
W
W/R
I
W/R
W/R
W/R
I/R
I
I
I
First welding
第一次焊接
Each Joint
每个口
Each Joint
每个口
Each Weld Joint
每道口
As Required
按需要
Follow NDE
Requirements
按Pro
Ra求
按比例
Each Line
每条管线
Each Line
每条管线
Each Pipeline
每条线
Each Pipeline
每条线
As construction
contractor
As construction
contractor
SH/T 3503-G415
Test Report
Test Report
SH/T 3503-J402
SH/T 3543-G406
According to test
package
4.208
RT/UT/MT/PT examination for
weldJoints 焊逢NDE检查
NDE检查出现不合格的焊缝定位
NB/T47013-2015
NB/T47013.2-2015
SH3501-2011 Sec.5.
SH3501-2011 Sec.6.
SH3501-2011 Sec.8.
SH3501-2011 Sec.8.
SH3501-2011 Sec.6.
B
A
A
B
A
A
A
P/QR
I
T/QR
I
I
I
I
R
R
R
R
W
W
W
4.209
及返 修
4.210
Valve Test
阀门试验
Pipe Installation
4.211
管线安装
Pressure Test
4.212
压力试验
Pipeline Flushing
4.213
管道冲洗
Concealment Acceptance
4.214
隐蔽验收
SHT3503-J406
SHT3503-J410
SH/T 3503-J408
SH/T 3503-J112
SH/T 3503-J416
As required
As required
As required
Pipeline Static Earthing
4.215
管道静电接地
4.216
Tie-in点现场确认并挂牌
4.217
开管前检查确认
4.218
Tie-in施工完成后验收及挂牌上锁
SH3501-2011
Darwng
Darwng
Darwng
SH3501-2011 Sec.6.
Darwng
Darwng
Darwng
B
A
A
A
I
I
I
I
R
I
I
I
As Required
按需要
每个Tie点
each Tie
每个Tie点
each Tie
每个Tie点
each Tie
ITP No.
INSPECTION ACTIVITY
APPLICABLE
PROCEDURE
ACCEPTANCE
CRITERIA
GRADE
RESPONSIBILITY
(Note)
(Note)
Contr Ashlan
QSC SQIB
actor d
INSPECTION
FREQUENCY
QUALITY RECORD
/VERIFICATION
DOCUMENT
4.3 PAINTING 防腐
4.301
验证材料合格证书及材料实验报告
4.302
4.303
Surface Preparation
表面准备
Painting Inspection
防腐检查
SH/T3548-2011
SH/T3548-2011
SH/T3548-2011
SH/T3548-2011 Sec.4.
SH/T3548-2011 Sec.5.
SH/T3548-2011 Sec.6.
A
H
H
I/QR
I
I
I/R
R
R
I/R
I/R
I/R
Each Batch
每批
Each Item
每项
Each Item
每项
SH/T 3503 -J132
Copy of Material mill
certificate
SH/T 3503-J112
SH/T 3503-J118
4.4 INSULATION 保温
Material Site Acceptance
4.401
材料进场
4.402
4.403
4.404
Surface Preparation
表面准备
Hot Inspection
保温检查
Jacket Installation
保护层安装
GB50645-2011
GB50645-2011
GB50645-2011
GB50645-2011
GB50645-2011 Sec.4.
GB50645-2011 Sec.4.
GB50645-2011 Sec.5.
GB50645-2011 Sec.6.
A
A
A
A
I/QR
I
I
I
I/R
R
R
R
I/R
I/R
I/R
I/R
Each Batch
每批
Each Item
每项
Each Item
每项
Each Item
每项
SH/T 3503 -J132
Copy of Material mill
certificate
SH/T 3503-J112
SH/T 3503-J119
SH/T 3503-J119
4.5 INSPECTION
4.501
Final Visual Inspection
管道安装工程验收
SH3501-2011 SH3501-2011 Sec.9.
A I
I/R
I/R
R
Each work
每个工程
SH/T 3508-Y04
5.0 Electrical
Material Site Acceptance
5.001
材料进场
5.002
5.003
5.004
Special Worker Report
特殊工种报验
GB50257-2014
GB50257-2014
GB50171-2012
GB50168-2016
GB50257-2014 Sec. 3.
GB50257-2014 Sec. 3.
GB50171-2012 Sec.2.
GB50168-2016 Sec4.
A
A
A
B
I/QR
T/QR
I
I
I/R
R
I
R
I/R
R
I/R
I/R
Each Batch
每批
As Required
按需要
SH/T 3503 -J132
Copy of Material mill
certificate
Copy of certificate
SH/T 3503-J508
SHT3543-G527
SH/T 3543-G526
SHT3503-J503
Switch Gear Inspection Check
电气盘柜安装
Inspection Conduit And Cable tray
电缆保护管和电缆桥架检查
Small Power EDP
每台开关柜
Each Batch
每批
ITP No.
INSPECTION ACTIVITY
5.005
5.006
Cable Laying and test Of Insulation
电缆敷设及绝缘检查
APPLICABLE
PROCEDURE
GB50168-2016
GB50303-2015
ACCEPTANCE
CRITERIA
GB50168-2016 Sec5
GB50303-2015 Sec. 19./22.
GB50170-2006 Sec.4.0.
1- 4.0.6
GB50169-2016 Sec3.
GB50150-2016 Sec.25.
SH/T3508-2011Sec.6.
GRADE
RESPONSIBILITY
(Note)
(Note)
Contr Ashlan
QSC SQIB
actor d
B
B
T
I
R
I
W/R
I/R
INSPECTION
FREQUENCY
Each Cable
每根电缆
Each Batch
每批
Each Motor
每台电机
As Required
按照要求
Each Inspection Point
每处接地
QUALITY RECORD
/VERIFICATION
DOCUMENT
SH/T 3503-J504
SH/T 3503-J505
SHT3543-G525
Lighting Installation
电气照明安装
Inspection InstallationAnd No-Load
5.007
Operation Of Motor
电动机安装检查及空载运行
5.008
5.009
5.010
Inspection Conceal Work
接地隐蔽检查
Grounding Resistance Test
接地电阻测量
GB50170-2006
GB50169-2016
GB50150-2016
SH/T3508-2011
A
A
A
A
I
I
T/QR
I
I
R
W
I/R
I/R
I/R
W
I/R
SH/T 3503-J502
SH/T 3503-J112
SH/T 3503-J122
SH/T 3508-Y04
R
Final Visual Inspection
电气安装工程验收
Each work
每个工程
6. INSTRUMENT
Material Site Acceptance
6.001
材料进场
6.002
6.003
Calibration For Instrument
仪表设备调校
Field instrument installation check
现场仪表安装检查
GB50093-2013
GB50093-2013
GB50093-2013
GB50093-2013Sec3.2
GB50093-2013Sec. 12.
GB50093-2013Sec.6
A
A
B
I/QR
T
I
I/R
R
R
I/R
I/R
I/R
All Material
Each Instrument
每台仪表
Each Instrument
每台仪表
SH/T 3503 -J132
Copy of Material mill
certificate
SH/T 3503-J601
SH/T 3543-
G604/G605
SH/T 3543-G620
Duct/Cable Tray Installation Inspection
6.004
Record
汇线槽/桥架安装检查记录
GB50093-2013
GB50093-2013Sec.7.
A
I
W
W/R
R
All tray
所有桥架
Each Cable
每根电缆
As Required
按照要求
SH/T3543-G615
SH/T 3543-G613
SH/T3543-G614
SH/T 3503-J122
SH/T 3503-J607
SH/T 3503-J608
SH/T 3503-J610
SH/T 3508-Y04
6.005
6.006
6.007
6.008
6.009
Inspection Cable Laying
电缆敷设及绝缘检查
Measure Earth Resistance
GB50093-2013
GB50093-2013
GB50093-2013
GB50093-2013
SH/T3508-2011
GB50093-2013Sec.7.
GB50093-2013Sec. 10.
GB50093-2013Sec. 12.
GB50093-2013Sec. 12.
SH/T3508-2011Sec.6.
A
A
A
A
A
I
T
T
T
I
W
W
W
W
I/R
W/R
W/R
W/R
W/R
I/R
接地电阻测试检查
DCS Test
综合控制系统基本功能检测
Interlock Test
报警/联锁系统调试
Final Visual Inspection
仪表安装工程验收
Each Instrument
每台仪表
system
Each work
每个工程
ITP No.
INSPECTION ACTIVITY
APPLICABLE
PROCEDURE
ACCEPTANCE
CRITERIA
GRADE
RESPONSIBILITY
(Note)
(Note)
Contr Ashlan
QSC SQIB
actor d
INSPECTION
FREQUENCY
QUALITY RECORD
/VERIFICATION
DOCUMENT
7.0 System Turnover7.001
System Punch
系统尾项
系统移交
MC机械竣工
SH/T3508-2011
SH/T3508-2011Sec.7.
A I
I/R
I/R
I/R
每个系统
Punch List
7.002
7.003
SH/T3508-2011
SH/T3508-2011
GB50300-2013
SH/T3508-2011
SH/T 3503
SH/T 3543
SH/T3508-2011Sec.7.
SH/T3508-2011Sec.7.
A
H
I
I
I/R
I/R
I/R
I/R
I/R
I/R
每个系统
Each work
每个工程
Page 11 of 12
SHT3503-J106A
8.0 FINAL ACCEPTANCE OF THE PROJECT
8.001
Final acceptance
工程竣工验收
Hand over the project technical data
工程技术资料移交
GB50300-2013
SH/T3508-2011
SH/T 3503
SH/T 3543
H QR R R R
Whole Rroject
整个工程
Whole Rroject
整个工程
SH/T 3503-J107A
8.002
H QR R R R
SH/T 3503-J108A
NOTE:
Inspection Grade
H : 停检点,需要FIN 通知各方检查( Filed Inspection Notice)
A : A类需要监理、业主及承包商共同参加检查(FIN)
B : B类需要监理参加检查
C : C类由承包商检查并监理随机见证检查
Scope of Inspection
Contractor : Construction / Supplies / Services Contractor 施工/供应商/服务承包商
Ashland : OWNER’s Project Management Team 业主管理组
QSC: Quality Supervision Company 监理单位
SQIB: Sinopec Quality Inspection Bureau 南京市石油化工建设工程质量安全监督站
Responsibility
I : 检查
T : 测试
W :
见证、要求通知相关检查人员抽检检查
R :
审阅和批准质量文件、方案等,文件记录
QR :
提供QC资料和证明文件等
P:
承包商提供申请由第三方实验室检查
S: 随机见证和检查 要求通知相关检验人员